WTMA Wastewater Project

Waynesboro, PA


Timeframe: April 2013 - October 2014

Job Description:
Wastewater Conveyance System Upgrades

Customer:
Washington Township Municipal Authority
c/o CET Engineering Services-GDH
Kevin B. Shannon
1240 N. Mountain Road
Harrisburg, PA 17112
(717) 541-0622


Contract Amount: $4,648,618.83

Services Performed:
Replacement of approximately 24,000 linear feet of sanitary main ranging in diameter from 10” to 36”, requiring bypass pumping of existing flows, 3 stream crossings utilizing portable cofferdams, 7 other stream crossings, large diameter (48” and 54”) horizontal bores under state roadways, associated manholes, lateral reconnections, related appurtenances, and restoration.




BEAMA Sanitary Sewer System Improvements

Everett, PA


Timeframe: April 2017 – October 2017

Job Description:
Sanitary/Storm Sewer Improvements

Customer:
Borough of Everett Area Municipal Authority
100 Mechanic Street
Johnstown, PA 15901


Contract Amount: $1,836,512.00

Services Performed:
Furnish and Install approximately 7,100 LF of 12”, 10” and 8” sanitary sewer and appurtenances; rehabilitate approximately 700 LF of 12”, 10”, and 8” sanitary sewer via cured-in-place pipe (CIPP); furnish and install a submersible pump station and approximately 200 LF of 2” HDPE force main; furnish and install approximately 700 LF of 6” water main and appurtenances, and all associated work complete in place.




Warren Commons

Warren, PA


Timeframe:

Job Description:
Commercial Development- Wal-Mart, Lowe’s, shops and out-lots

Customer:
Echo Real Estate Services
701 Alpha Drive
Pittsburgh, PA 15238
(412) 968-1660


Contract Amount: $8,366,778.00

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, soil stabilization, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, state roadwork, landscaping, signage and line striping.




SR 528 / Tomlinson Drive / Jodeener Drive Road Improvements

Jackson Township, PA


Timeframe: January 2016 – December 2016

Job Description:
Road improvements on two township roads and state route 528.

Customer:
Jackson Township
140 Magill Road
Zelienople, PA 16063
(724)452-5581


Contract Amount: $2,000,000.00

Services Performed:
Onsite earthmoving, erosion controls, clearing, grading, installation of storm sewer, installation of traffic lights, road widening, paving and landscaping.




Erie Welcome Center

North East Twp., PA


Timeframe:

Job Description:
Lead contractor for the site development and construction of a new Welcome Center on Interstate 90 at the New York State Line.

Customer:
Department of General Services
18th & Herr Streets
Harrisburg, PA 17125
(717) 787-6330


Contract Amount: $2,725,097.00

Services Performed:
Soil & erosion control, installation of storm, sanitary, water, and electric lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, landscaping, signage and line striping. Coordination of all prime contractors.




Newbury Market and Residential

Bridgeville, PA


Timeframe: August 2015-May 2016

Job Description:
Commercial Retail Space

Customer:
Newbury Development Management LLC
Eric Newhouse
1263 Newbury Highland
Bridgeville, PA, 15017


Contract Amount: $714,005.00

Services Performed:
Relocating building surcharge piles, extending existing sanitary and water lines, installing electric and gas crossings, trenching, bedding and backfilling for electric and gas lines.




Newbury Market Phase I

South Fayette, PA


Timeframe: July 2014- March 2015

Job Description:
Utility Project

Customer:
Newbury Development Associates L.P.
1302 Village Lane
Pittsburgh, Pa 15017
(724)-221-7093


Contract Amount: $2,362,281.20

Services Performed:
Onsite earthmoving (importation and exportation), site preparation, earthwork, soil and erosion control, site drainage, sanitary sewers, gas line trenching & backfill, waterline.




MCCA Sanitary Sewer Rehabiliation

Milesburg, PA


Timeframe: June 2014- June 2015

Job Description:
Sanitary Sewer System Rehabilitation

Customer:
Mid-Centre County Authority
c/o Herbert, Rowland & Grubic, Inc.
Benjamin R. Burns
474 Windmere Drive
Suite 100
State College, Pa 16801
(717) 541-0622


Contract Amount: $1,981,053.70

Services Performed:
Replacement of approximately 6,371 LF of sanitary sewer main and associated laterals, rehabilitation of approximately 4,923 LF of sewer main using cured-in-place pipe linings with lateral re-instatement and lining, improvements to a submersible raw sewage pumping station.




Apollo Borough Sewer Separation Project

Apollo, PA


Timeframe: September 2009 to September 2011

Job Description:
Sewer Separation Project

Customer:
Apollo Borough
c/o Olsen & Associates, LLC
Ronald Olsen
126 South Main Street
Butler, PA 16001
(724) 282-4786


Contract Amount: $6,882,416.16

Services Performed:
Soil & erosion control, installation of storm and sanitary lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, landscaping.




Cambria City / Coopersdale / Minersville Sanitary Sewer Separation Project

City of Johnstown, PA


Timeframe: April 2016 – February 2017

Job Description:
Sanitary/Storm Sewer Separation

Customer:
City of Johnstown
401 Main Street
Johnstown, PA 15901


Contract Amount: $6,201,442.00

Services Performed:
Contract No. 2016-06 Consists of the construction of approximately 12,830 liner feet of 8 inch sanitary sewer pipe via open-trench, rehabilitation of approximately 2,700 liner feet of existing 8 inch sanitary sewer pipe via slip lining, rehabilitation of approximately 340 linear feet of existing 8 inch sanitary sewer pipe via pipe bursting, rehabilitation of approximately 224 liner feet of existing 8 inch sanitary sewer pipe via Cured-In–Place-Pipe, 87 precast concrete manholes, and approximately 6,060 liner feet of 6 inch service laterals and related work. The storm sewer separation includes installation of approximately 450 liner feet of 12 inch storm sewer pipe, 76 inlets and restoration. The project is located in the Cambria City area of the city of Johnstown.

Contract No. 2016-07 consists of the construction of approximately 6,283 linear feet of 8 inch sanitary sewer pipe via open-trench, approximately 131 linear feet of 10 inch sanitary sewer pipe via open-trench, rehabilitation of approximately 446 linear feet of existing 8 inch sanitary sewer pipe via slip lining, rehabilitation of approximately 995 linear feet of 10 inch sanitary sewer pipe via pipe bursting, 2,100 linear feet of existing 8 inch sanitary sewer pipe via Cured-In-Place-Pipe, 2,080 linear feet of existing 10 inch sanitary sewer pipe via Cured-In-Place-Pipe, 73 precast concrete manholes, and approximately 915 linear feet of 6 inch service laterals and related work. The storm sewer separation includes installation of approximately 130 linear feet of 12 inch storm sewer pipe, 30 inlets and restoration. The project is located in the Minersville area of the City of Johnstown.




FedEx Ground Pittsburgh

Zelienople, PA


Timeframe: October 2014- May 2017

Job Description:
Distribution Center

Customer:
DSSTE, LLC
174 Tomlinson Drive
Zelienople, PA 16063
(724)-538-8400


Contract Amount: $58,000,000.00

Services Performed:
Onsite earthmoving, site preparation, earthwork, soil and erosion control, site drainage, installation of sanitary sewer system and storm water sewer system; including manholes, sewer main, wyes, laterals, inlets, and installation of water mains and appurtenances, including valves, hydrants, thrusts blocking.




Wal-Mart Supercenter #2561-02

Erie, PA


Timeframe: October 2011 – July 2012

Job Description:
Commercial Development - Wal-Mart

Customer:
Perry Construction Group, Inc.
Robert Doyle
1440 West 21st Street
Erie, PA 16502
(814) 459-8551


Contract Amount: $7,504,363.00

Services Performed:
Soil & erosion control, clearing and grubbing, installation of storm and sanitary, earthwork, grading, arch culvert, building demolition, well abandonments, horizontal drilling/boring, wetland mitigation.




Wal-Mart Supercenter #1769-001

DuBois, PA


Timeframe: July 2009 to June 2011

Job Description:
Commercial Development - Wal-Mart

Customer:
Leonard S. Fiore, Inc.
Michael L. Fiore
5506 6th Avenue, Rear
Altoona, PA 16602
(813) 946-3686


Contract Amount: $3,149,066.41

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, landscaping, signage and line striping.




PMF Rentals Job

Zelienople, PA


Timeframe: August 2016 – February 2017

Job Description:
Site development

Customer:
Bell Properties, Inc.
124 Plunket Drive
Zelienople, PA 16063


Contract Amount: $2,350,000.00

Services Performed:
Onsite earthmoving, site preparation, earthwork soil & erosion control, clearing, grading, and storm water management.




Greengate Centre

Greensburg, PA


Timeframe:

Job Description:
Wal-Mart, Sam’s Club, out-lots, future commercial and residential development

Customer:
THF Realty
Michael Staenberg
2127 Innerbelt Business Center Dr., Suite 200
St. Louis, MO 63114
(314) 429-0900


Contract Amount: $3,316,144.00

Services Performed:
Soil & erosion control, installation of storm, sanitary, water, gas and electric
lines, earthwork and tree clearing. 80,000 LF of utilities.




Lincoln Place

Greensburg, PA


Timeframe: September 2007 to February 2009

Job Description:
Commercial Development-Walgreens, shops and out-lots

Customer:
Walnut Capital
Tony Dolan
5500 Walnut Street, Suite 300
Pittsburgh, PA 15232
(412) 683-3810


Contract Amount: $4,961,152.40

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, retaining walls, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, state roadwork, landscaping, signage and line striping.




Brownstown Borough Wastewater Project

Johnstown, PA


Timeframe: October 2012 – November 2013

Job Description:
Wastewater System Improvements

Customer:
Brownstown Borough
c/o Keller Engineers, Inc.
William J. Henry
420 Allegheny Street
Hollidaysburg, PA 16648
(814) 696-7430


Contract Amount: $3,652,321.41

Services Performed:
Construction of approximately 25,000 linear feet of 8” & 6” PVC gravity wastewater main, 600 linear feet 2” pressure sewer main piping and 16,000 linear feet of 4” PVC service lateral piping with observation ports, manhole cleanouts, related appurtenances and restoration.




Mills Point

North Huntingdon, PA


Timeframe: May 2006 to August 2011

Job Description:
Commercial Development -Wal-Mart, shops and out-lots

Customer:
DeBartolo Development
Mike Weems
4401 W. Kennedy Blvd., 3rd Floor
Tampa, FL 33609
(813) 676-7677


Contract Amount: $13,462,934.44

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, state roadwork, landscaping, signage and line striping.




Wal-Mart Supercenter #4644

Moon Township, PA


Timeframe: August 2015 – March 2017

Job Description:
Site development for new Wal-Mart Supercenter

Customer:
Leonard S. Fiore, Inc.
5506 6th Avenue, Rear
Altoona, PA 16602
(814) 946-3686


Contract Amount: $5,100,000.00

Services Performed:
Onsite earthmoving, site preparation, earthwork soil & erosion control, clearing, site demolition, grading, building pad, retaining walls, and utilities.




Woodvale/Prospect Sewer Separation

Zelienople, PA


Timeframe: October 2014 – October 2015

Job Description:
Sanitary Sewer Separation Project

Customer:
The City of Johnstown
c/o The EADS Group
Stephen Kleck, EIT
227 Franklin Street
Johnstown, Pa 15901
(814)-535-5388


Contract Amount: $5,327,945.36

Services Performed:
General construction activities and all materials, equipment, supplies, labor and plant required to replace existing sanitary sewer and separate storm sewer lines from the sanitary sewer system. The sanitary sewer project includes installation of approximately 14,000 LF of 8" sewer mains via open trench excavation 940 LF of 10" sewer mains via open trench excavation, 1,960 LF of 8" sewer main via Cured-In-Place-Pipe lining, 420 LF of 10" sewer main via Cured-In-Place-Pipe lining, 550 LF of 12" sewer main via Cured-In-Place-Pipe lining, 100 precast concrete manholes, 5,270 LF of 6" service laterals and restoration. The storm sewer separation includes installation of approximately 380 FL of 12" pipe, 250 LF of 24" pipe, 6 precast concrete manholes, 68 inlets and restoration.




Jacksons Pointe Commerce Park

Zelienople, PA


Timeframe: August 2012 - January 2015

Job Description:
Phase II Site work

Customer:
The Buncher Company
Jerry Lieb
1300 Penn Avenue
Suite 300
Pittsburgh, PA 15222


Contract Amount: $3,265,286.39

Services Performed:
Site Preparation, clearing & grubbing, earthwork, sediment & erosion control, site drainage, paving, concrete, lawn seeding & steep slope hydro-seeding, cleanup & site restoration.



Juniata Valley Pike and South Porter Township

Alexandria Borough & Porter Township, PA


Timeframe: May 2011 – July 2012

Job Description:
Wastewater Collection System Extensions

Customer:
Alexandria Borough & Porter
Township Joint Sewer Authority
c/o Gwin, Dobson, & Foreman, Inc.
Joshua James
3121 Fairway Drive
Altoona, PA 16602
(814) 943-5214


Contract Amount: $3,310,151.69

Services Performed:
Construction of combination force main and gravity sewer collection system and appurtenances, 4 sewer pumping stations, 9 residential grinder pump stations and appurtenances, soil & erosion control, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, landscaping.



MEPCO Overland Conveyor

Diliner, PA


Timeframe: April 2010 to May 2011

Job Description:
Overland Conveyor

Customer:
MEPCO Conveyor, LLC
CCC Group, Inc.
Matt Turnman
5797 Dietrich Road
San Antonio, TX 78219
(210) 661-4251


Contract Amount: $2,404,424.60

Services Performed:
Concrete foundation, concrete structures, concrete tunnels, shoring, and reclamation pit all performed under Federal Mining Regulations (MSHA).



Newbury Market Phase 1- Remaining Grading & Utility Project

Bridgeville, PA


Timeframe: August 2015 – May 2016

Job Description:
Commercial Retail Space

Customer:
Newbury Development Management LLC
Eric Newhouse
1263 Newbury Highland
Bridgeville, Pa 15017
(724) 221-7093


Contract Amount: $714,005.00

Services Performed:
Relocating building surcharge piles, extending existing sanitary and water lines, installing electric and gas crossings, trenching, bedding and backfilling for electric and gas lines.



Rustic Ridge Plan of Lots (Developer)

Franklin Park Borough, PA


Timeframe:

Job Description:
52 acre upscale residential development

Customer:
Rustic Ridge Group
Douglas J. Sippel
2412 Rustic Ridge Drive
Sewickley, PA 15143
(724) 940-4422


Contract Amount: $1,656,000.00

Services Performed:
Soil & erosion control, tree clearing, excavation, 1750 LF by 26’ wide, 12” sub-base, 3” binder, 2” wearing surface, Township Roads with conc. curb & gutter, blasting, utilities, storm sewer, paving, concrete, landscaping.



Smithfield Town Center

Huntingdon, PA


Timeframe:

Job Description:
Commercial Development- Wal-Mart, shops and out-lots

Customer:
THF Realty
Michael Staenberg
2127 Innerbelt Business Center Dr., Suite 200
St. Louis, MO 63114
(314) 429-0900


Contract Amount: $4,288,924.00

Services Performed:
Soil & erosion control, installation of storm, sanitary, water, and electric lines, earthwork, and grading. Moved 800,000 CY dirt, and 40,000 LF of utilities.



South Hills Village

Bethel Park, PA


Timeframe: September 2016 – March 2018

Job Description:
South Hills Village Apartments

Customer:
Rycon Construction, Inc.
2501 Smallman Street
Suite 100
Pittsburgh, PA 15222
(412) 392-2525


Contract Amount: $1,406,000.00

Services Performed:
Onsite earthmoving, site preparation, earthwork soil & erosion control, clearing, grading, and site utilities.



Wal-Mart Store # 2281-02

West Mifflin, PA


Timeframe:

Job Description:
Commercial Development

Customer:
Westra Construction, Inc.
4002 Fenton Avenue
Harrisburg, PA 17109


Contract Amount: $4,092,000.00

Services Performed:
Soil & erosion control, moved 411,000 CY dirt, 14,500 LF of pipe stone sub base, paving, and pavement markings.