WTMA Wastewater Project

Waynesboro, PA


Timeframe: April 2013 - October 2014

Job Description:
Wastewater Conveyance System Upgrades

Customer:
Washington Township Municipal Authority
c/o CET Engineering Services-GDH
Kevin B. Shannon
1240 N. Mountain Road
Harrisburg, PA 17112
(717) 541-0622


Contract Amount:

Services Performed:
Replacement of approximately 24,000 linear feet of sanitary main ranging in diameter from 10” to 36”, requiring bypass pumping of existing flows, 3 stream crossings utilizing portable cofferdams, 7 other stream crossings, large diameter (48” and 54”) horizontal bores under state roadways, associated manholes, lateral reconnections, related appurtenances, and restoration.




BEAMA Sanitary Sewer System Improvements

Everett, PA


Timeframe: April 2017 – October 2017

Job Description:
Sanitary/Storm Sewer Improvements

Customer:
Borough of Everett Area Municipal Authority
100 Mechanic Street
Johnstown, PA 15901


Contract Amount:

Services Performed:
Furnish and Install approximately 7,100 LF of 12”, 10” and 8” sanitary sewer and appurtenances; rehabilitate approximately 700 LF of 12”, 10”, and 8” sanitary sewer via cured-in-place pipe (CIPP); furnish and install a submersible pump station and approximately 200 LF of 2” HDPE force main; furnish and install approximately 700 LF of 6” water main and appurtenances, and all associated work complete in place.




Warren Commons

Warren, PA


Timeframe:

Job Description:
Commercial Development- Wal-Mart, Lowe’s, shops and out-lots

Customer:
Echo Real Estate Services
701 Alpha Drive
Pittsburgh, PA 15238
(412) 968-1660


Contract Amount:

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, soil stabilization, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, state roadwork, landscaping, signage and line striping.




The Crossings at State College

Ferguson Twp., PA


Timeframe: April 2017 - Present

Job Description:
4 Acre site located in Ferguson Twp., PA. Will be a single multi-use building.

Customer:
Intergrated Construction LLC
300 W Adams Street, Suite 650
Jacksonville, FL 32202


Contract Amount:

Services Performed:
Clearing & grubbing. Install & maintenance of E&S. Install retaining walls. 20,000 CY of earthwork, 2,000 LF of storm, 700 LF of Sanitary, 1,000 LF of water, and 1,300 LF of dry utilities.




SR 528 / Tomlinson Drive / Jodeener Drive Road Improvements

Jackson Township, PA


Timeframe: January 2016 – December 2016

Job Description:
Road improvements on two township roads and state route 528.

Customer:
Jackson Township
140 Magill Road
Zelienople, PA 16063
(724)452-5581


Contract Amount:

Services Performed:
Onsite earthmoving, erosion controls, clearing, grading, installation of storm sewer, installation of traffic lights, road widening, paving and landscaping.




Erie Welcome Center

North East Twp., PA


Timeframe:

Job Description:
Lead contractor for the site development and construction of a new Welcome Center on Interstate 90 at the New York State Line.

Customer:
Department of General Services
18th & Herr Streets
Harrisburg, PA 17125
(717) 787-6330


Contract Amount:

Services Performed:
Soil & erosion control, installation of storm, sanitary, water, and electric lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, landscaping, signage and line striping. Coordination of all prime contractors.




Newbury Market and Residential

Bridgeville, PA


Timeframe: August 2015-May 2016

Job Description:
Commercial Retail Space

Customer:
Newbury Development Management LLC
Eric Newhouse
1263 Newbury Highland
Bridgeville, PA, 15017


Contract Amount:

Services Performed:
Relocating building surcharge piles, extending existing sanitary and water lines, installing electric and gas crossings, trenching, bedding and backfilling for electric and gas lines.




Newbury Market Phase I

South Fayette, PA


Timeframe: July 2014- March 2015

Job Description:
Utility Project

Customer:
Newbury Development Associates L.P.
1302 Village Lane
Pittsburgh, Pa 15017
(724)-221-7093


Contract Amount:

Services Performed:
Onsite earthmoving (importation and exportation), site preparation, earthwork, soil and erosion control, site drainage, sanitary sewers, gas line trenching & backfill, waterline.




Moxham Phase II

Johnstown, PA


Timeframe: July 2017 - Present

Job Description:
Moxham Phase II Sanitary/Storm Sewer Separation Project, Contracts 2017-03 and 2017-04.

Customer:
The City of Johnstown
401 Main Street
Johnstown, PA 15901


Contract Amount:

Services Performed:
Construction of approximately 17,630 linear feet of 8 inch sanitary sewer pipe via open-trench, 300 linear feet of 18” sanitary sewer pipe via open-trench, rehabilitation of approximately 15,360 linear feet of existing 8 inch sanitary sewer pipe via Cured-In-Place-Pipe, 154 precast concrete manholes, 56 manhole rehabilitations, and approximately 12,888 linear feet of 6 inch service laterals and related work. The storm sewer separation also includes installation of approximately 2800 linear feet of various size storm sewer pipe, approximately 30 inlets and 30 storm manholes. The work includes all required lawn, concrete curb and sidewalk, and bituminous paving restoration. The project is located in the Moxham area of the City of Johnstown.




MCCA Sanitary Sewer Rehabiliation

Milesburg, PA


Timeframe: June 2014- June 2015

Job Description:
Sanitary Sewer System Rehabilitation

Customer:
Mid-Centre County Authority
c/o Herbert, Rowland & Grubic, Inc.
Benjamin R. Burns
474 Windmere Drive
Suite 100
State College, Pa 16801
(717) 541-0622


Contract Amount:

Services Performed:
Replacement of approximately 6,371 LF of sanitary sewer main and associated laterals, rehabilitation of approximately 4,923 LF of sewer main using cured-in-place pipe linings with lateral re-instatement and lining, improvements to a submersible raw sewage pumping station.




Jackson’s Point Phase 3

Jackson Twp., PA


Timeframe: March 2017 - Present

Job Description:
40 Acre site located at the intersection of 19 & 528 in Jackson Twp. The site will be used for retail, office, & restaurant space.

Customer:
The Buncher Company
1300 Penn Ave
Pittsburgh, PA 15222
412-422-9900


Contract Amount:

Services Performed:
Clearing & grubbing, install and maintenance of erosion control, 645k CY of earth moving, 2,308 LF of sanitary, and 1,800 LF of Storm.




Apollo Borough Sewer Separation Project

Apollo, PA


Timeframe: September 2009 to September 2011

Job Description:
Sewer Separation Project

Customer:
Apollo Borough
c/o Olsen & Associates, LLC
Ronald Olsen
126 South Main Street
Butler, PA 16001
(724) 282-4786


Contract Amount:

Services Performed:
Soil & erosion control, installation of storm and sanitary lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, landscaping.




Cambria City / Coopersdale / Minersville Sanitary Sewer Separation Project

City of Johnstown, PA


Timeframe: April 2016 – February 2017

Job Description:
Sanitary/Storm Sewer Separation

Customer:
City of Johnstown
401 Main Street
Johnstown, PA 15901


Contract Amount:

Services Performed:
Contract No. 2016-06 Consists of the construction of approximately 12,830 liner feet of 8 inch sanitary sewer pipe via open-trench, rehabilitation of approximately 2,700 liner feet of existing 8 inch sanitary sewer pipe via slip lining, rehabilitation of approximately 340 linear feet of existing 8 inch sanitary sewer pipe via pipe bursting, rehabilitation of approximately 224 liner feet of existing 8 inch sanitary sewer pipe via Cured-In–Place-Pipe, 87 precast concrete manholes, and approximately 6,060 liner feet of 6 inch service laterals and related work. The storm sewer separation includes installation of approximately 450 liner feet of 12 inch storm sewer pipe, 76 inlets and restoration. The project is located in the Cambria City area of the city of Johnstown.

Contract No. 2016-07 consists of the construction of approximately 6,283 linear feet of 8 inch sanitary sewer pipe via open-trench, approximately 131 linear feet of 10 inch sanitary sewer pipe via open-trench, rehabilitation of approximately 446 linear feet of existing 8 inch sanitary sewer pipe via slip lining, rehabilitation of approximately 995 linear feet of 10 inch sanitary sewer pipe via pipe bursting, 2,100 linear feet of existing 8 inch sanitary sewer pipe via Cured-In-Place-Pipe, 2,080 linear feet of existing 10 inch sanitary sewer pipe via Cured-In-Place-Pipe, 73 precast concrete manholes, and approximately 915 linear feet of 6 inch service laterals and related work. The storm sewer separation includes installation of approximately 130 linear feet of 12 inch storm sewer pipe, 30 inlets and restoration. The project is located in the Minersville area of the City of Johnstown.




Friendship Village Senior Residential Development

South Hills Village, PA


Timeframe: July 2017 - Present

Job Description:
This project consists of providing new infrastructure by preforming demo activities on existing buildings and pavement. The new infrastructure will be utilities, paving, and earthwork for the new facility.

Customer:
Lecesse Construction
75 Thruway Park Drive
West Henrietta, NY 14586


Contract Amount:

Services Performed:
Erosion control, 60,000 CY of excavation, clearing and grubbing, demolition, 1,200 LF of sanitary, 10,160 LF of storm, waterline, gas, electric, concrete and asphalt paving, and retaining walls.




New Castle Building I

Frackville, PA


Timeframe: July 2019-Present

Job Description:
Site work and utility installation for the construction of a large scale commercial facility in Frackville, PA

Customer:
Clayco, Inc.
2199 Innerbelt Business Center Drive
St. Louis, MO 63114


Contract Amount:

Services Performed:
Erosion control of a 65 acre site including earthmoving. Utilities include storm sewer, sanitary water, electric, and gas.




FedEx Ground Pittsburgh

Zelienople, PA


Timeframe: October 2014- May 2017

Job Description:
Distribution Center

Customer:
DSSTE, LLC
174 Tomlinson Drive
Zelienople, PA 16063
(724)-538-8400


Contract Amount:

Services Performed:
Onsite earthmoving, site preparation, earthwork, soil and erosion control, site drainage, installation of sanitary sewer system and storm water sewer system; including manholes, sewer main, wyes, laterals, inlets, and installation of water mains and appurtenances, including valves, hydrants, thrusts blocking.




Wal-Mart Supercenter #2561-02

Erie, PA


Timeframe: October 2011 – July 2012

Job Description:
Commercial Development - Wal-Mart

Customer:
Perry Construction Group, Inc.
Robert Doyle
1440 West 21st Street
Erie, PA 16502
(814) 459-8551


Contract Amount:

Services Performed:
Soil & erosion control, clearing and grubbing, installation of storm and sanitary, earthwork, grading, arch culvert, building demolition, well abandonments, horizontal drilling/boring, wetland mitigation.




Ebensburgh Sewer Improvements

Ebensburg, PA


Timeframe: May 2018 - Present

Job Description:
Sanitary Sewer Improvements to the existing sanitary system within Ebensburg Borough, Cambria County, PA

Customer:
Ebensburg Municipal Authority
300 West High Street
Ebensburg, PA 15931


Contract Amount:

Services Performed:
The project consists of the construction of approximately 80,000 lineal feet of conventional gravity sewer main ranging in size from 4” to 21” diameter, approximately 2,000 lineal feet of storm sewer, manholes, laterals, horizontal borings, inlets, and all necessary appurtenances. The work also includes restoration of lawns, sidewalks, curbs, and paved surfaces.




Wal-Mart Supercenter #1769-001

DuBois, PA


Timeframe: July 2009 to June 2011

Job Description:
Commercial Development - Wal-Mart

Customer:
Leonard S. Fiore, Inc.
Michael L. Fiore
5506 6th Avenue, Rear
Altoona, PA 16602
(813) 946-3686


Contract Amount:

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, landscaping, signage and line striping.




Middlesex Crossings

Middlesex Twp., PA


Timeframe: April 2017 - Present

Job Description:
95 Acre site located at the intersection of Rte. 8 & 228 in Middlesex Twp. Site is a mixed use development with town homes, single family homes, as well as retail & professional buildings.

Customer:
NWPA Development, LP
1272 Mars Evan City Road
Evan City, PA 16033


Contract Amount:

Services Performed:
Clearing & grubbing, install and maintenance of erosion control, 630k CY of earth moving, 14,000 LF of storm pipe, and 12,000 LF of Sanitary.




PMF Rentals Job

Zelienople, PA


Timeframe: August 2016 – February 2017

Job Description:
Site development

Customer:
Bell Properties, Inc.
124 Plunket Drive
Zelienople, PA 16063


Contract Amount:

Services Performed:
Onsite earthmoving, site preparation, earthwork soil & erosion control, clearing, grading, and storm water management.




Greengate Centre

Greensburg, PA


Timeframe:

Job Description:
Wal-Mart, Sam’s Club, out-lots, future commercial and residential development

Customer:
THF Realty
Michael Staenberg
2127 Innerbelt Business Center Dr., Suite 200
St. Louis, MO 63114
(314) 429-0900


Contract Amount:

Services Performed:
Soil & erosion control, installation of storm, sanitary, water, gas and electric
lines, earthwork and tree clearing. 80,000 LF of utilities.




Lincoln Place

Greensburg, PA


Timeframe: September 2007 to February 2009

Job Description:
Commercial Development-Walgreens, shops and out-lots

Customer:
Walnut Capital
Tony Dolan
5500 Walnut Street, Suite 300
Pittsburgh, PA 15232
(412) 683-3810


Contract Amount:

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, retaining walls, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, state roadwork, landscaping, signage and line striping.




Brownstown Borough Wastewater Project

Johnstown, PA


Timeframe: October 2012 – November 2013

Job Description:
Wastewater System Improvements

Customer:
Brownstown Borough
c/o Keller Engineers, Inc.
William J. Henry
420 Allegheny Street
Hollidaysburg, PA 16648
(814) 696-7430


Contract Amount:

Services Performed:
Construction of approximately 25,000 linear feet of 8” & 6” PVC gravity wastewater main, 600 linear feet 2” pressure sewer main piping and 16,000 linear feet of 4” PVC service lateral piping with observation ports, manhole cleanouts, related appurtenances and restoration.




Mills Point

North Huntingdon, PA


Timeframe: May 2006 to August 2011

Job Description:
Commercial Development -Wal-Mart, shops and out-lots

Customer:
DeBartolo Development
Mike Weems
4401 W. Kennedy Blvd., 3rd Floor
Tampa, FL 33609
(813) 676-7677


Contract Amount:

Services Performed:
Soil & erosion control, tree clearing, installation of storm, sanitary, water, and electric lines, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, site lighting, state roadwork, landscaping, signage and line striping.




Wal-Mart Supercenter #4644

Moon Township, PA


Timeframe: August 2015 – March 2017

Job Description:
Site development for new Wal-Mart Supercenter

Customer:
Leonard S. Fiore, Inc.
5506 6th Avenue, Rear
Altoona, PA 16602
(814) 946-3686


Contract Amount:

Services Performed:
Onsite earthmoving, site preparation, earthwork soil & erosion control, clearing, site demolition, grading, building pad, retaining walls, and utilities.




Woodvale/Prospect Sewer Separation

Zelienople, PA


Timeframe: October 2014 – October 2015

Job Description:
Sanitary Sewer Separation Project

Customer:
The City of Johnstown
c/o The EADS Group
Stephen Kleck, EIT
227 Franklin Street
Johnstown, Pa 15901
(814)-535-5388


Contract Amount:

Services Performed:
General construction activities and all materials, equipment, supplies, labor and plant required to replace existing sanitary sewer and separate storm sewer lines from the sanitary sewer system. The sanitary sewer project includes installation of approximately 14,000 LF of 8" sewer mains via open trench excavation 940 LF of 10" sewer mains via open trench excavation, 1,960 LF of 8" sewer main via Cured-In-Place-Pipe lining, 420 LF of 10" sewer main via Cured-In-Place-Pipe lining, 550 LF of 12" sewer main via Cured-In-Place-Pipe lining, 100 precast concrete manholes, 5,270 LF of 6" service laterals and restoration. The storm sewer separation includes installation of approximately 380 FL of 12" pipe, 250 LF of 24" pipe, 6 precast concrete manholes, 68 inlets and restoration.




Cooper Twp Waste Water Collection and Conveyance System

Cooper Township, P


Timeframe: February 2018 – Present

Job Description:
The work consists of the installation of 39,500 linear feet of 6” and 8” gravity sanitary sewer pipe, 5,500 linear feet of 1-1/2” and 2” force main pipe, a sanitary sewer lift station, and two residential grinder pumps stations and all required appurtenances.

Customer:
Cooper Township Municipal Authority
59 Steltz Road
Danville, PA 17821


Contract Amount:

Services Performed:
All site work including excavation, dewatering, bedding, pipe installation, backfill, paving and surfacing, topsoil, seeding and mulching, soil erosion and sedimentation control, diversion of stream flows, stream crossings, and horizontal boring necessary for the installation of sanitary sewer piping across state highways, manholes, lateral connections, pumping stations, alignment testing, air testing, infiltration testing and vacuum testing.



Jacksons Pointe Commerce Park

Zelienople, PA


Timeframe: August 2012 - January 2015

Job Description:
Phase II Site work

Customer:
The Buncher Company
Jerry Lieb
1300 Penn Avenue
Suite 300
Pittsburgh, PA 15222


Contract Amount:

Services Performed:
Site Preparation, clearing & grubbing, earthwork, sediment & erosion control, site drainage, paving, concrete, lawn seeding & steep slope hydro-seeding, cleanup & site restoration.



Juniata Valley Pike and South Porter Township

Alexandria Borough & Porter Township, PA


Timeframe: May 2011 – July 2012

Job Description:
Wastewater Collection System Extensions

Customer:
Alexandria Borough & Porter
Township Joint Sewer Authority
c/o Gwin, Dobson, & Foreman, Inc.
Joshua James
3121 Fairway Drive
Altoona, PA 16602
(814) 943-5214


Contract Amount:

Services Performed:
Construction of combination force main and gravity sewer collection system and appurtenances, 4 sewer pumping stations, 9 residential grinder pump stations and appurtenances, soil & erosion control, earthwork, grading, demolition, concrete paving, curbs and sidewalks, asphalt paving, landscaping.



McCandless Square

McCandless, PA


Timeframe: May 2020 - January 2021

Job Description:
Removal of asphalt parking lot. Install E/S controls including a bio retention pond. Installation of storm piping, sanitary sewer, and dry utilities.

Customer:
Continental Building Company
150 E Broad Street
Columbus, OH 43215


Contract Amount:

Services Performed:
Site excavation, backfill and compaction of earth to establish pads for a three story assisted living building along with 13 cottages.



MEPCO Overland Conveyor

Diliner, PA


Timeframe: April 2010 to May 2011

Job Description:
Overland Conveyor

Customer:
MEPCO Conveyor, LLC
CCC Group, Inc.
Matt Turnman
5797 Dietrich Road
San Antonio, TX 78219
(210) 661-4251


Contract Amount:

Services Performed:
Concrete foundation, concrete structures, concrete tunnels, shoring, and reclamation pit all performed under Federal Mining Regulations (MSHA).



Newbury Market Phase 1- Remaining Grading & Utility Project

Bridgeville, PA


Timeframe: August 2015 – May 2016

Job Description:
Commercial Retail Space

Customer:
Newbury Development Management LLC
Eric Newhouse
1263 Newbury Highland
Bridgeville, Pa 15017
(724) 221-7093


Contract Amount:

Services Performed:
Relocating building surcharge piles, extending existing sanitary and water lines, installing electric and gas crossings, trenching, bedding and backfilling for electric and gas lines.



Potters Mills Wastewater System Improvements Project

Potters Township


Timeframe: October 2018 - Present

Job Description:
Furnish and Install a package wastewater treatment plant, STEP and FRP septic tanks with pump systems, laterals, pressure collection system, force main, discharge line, and all other equipment, piping, and appurtenances for a complete operating treatment plant and collection system for 46 properties in Potters Mills, Centre County, PA.

Customer:
Potters Township
124 Short Road
Spring Mills, PA 16875


Contract Amount:

Services Performed:
Install packaged wastewater treatment plant, construct support building including ultra-violet disinfection system and flow meter, install up to 3” discharge and collection piping via open cut and horizontal directional drilling (sub), install septic tanks with pumps and control panels, install all valves, and flushing connections necessary to complete the system. Also removed existing septic tanks and performed all restoration of private yard and public right of ways.



Rustic Ridge Plan of Lots (Developer)

Franklin Park Borough, PA


Timeframe:

Job Description:
52 acre upscale residential development

Customer:
Rustic Ridge Group
Douglas J. Sippel
2412 Rustic Ridge Drive
Sewickley, PA 15143
(724) 940-4422


Contract Amount:

Services Performed:
Soil & erosion control, tree clearing, excavation, 1750 LF by 26’ wide, 12” sub-base, 3” binder, 2” wearing surface, Township Roads with conc. curb & gutter, blasting, utilities, storm sewer, paving, concrete, landscaping.



Sewickley Independent Living

Sewickley, PA


Timeframe: August 2018 - February 2019

Job Description:
Site work and utility installation for the construction of a retirement facility in Sewickley, PA

Customer:
Warfel Construction
1110 Enterprise Road
East Petersburg, PA 17520


Contract Amount:

Services Performed:
Clearing, grubbing and erosion control of a 4 acre site including earthmoving and soil stabilization. Utilities include storm sewer, sanitary water, electric, and gas.



Smithfield Town Center

Huntingdon, PA


Timeframe:

Job Description:
Commercial Development- Wal-Mart, shops and out-lots

Customer:
THF Realty
Michael Staenberg
2127 Innerbelt Business Center Dr., Suite 200
St. Louis, MO 63114
(314) 429-0900


Contract Amount:

Services Performed:
Soil & erosion control, installation of storm, sanitary, water, and electric lines, earthwork, and grading. Moved 800,000 CY dirt, and 40,000 LF of utilities.



South Hills Village

Bethel Park, PA


Timeframe: September 2016 – March 2018

Job Description:
South Hills Village Apartments

Customer:
Rycon Construction, Inc.
2501 Smallman Street
Suite 100
Pittsburgh, PA 15222
(412) 392-2525


Contract Amount:

Services Performed:
Onsite earthmoving, site preparation, earthwork soil & erosion control, clearing, grading, and site utilities.



Top Golf

Independence, OH


Timeframe: September 2019 - October 2019

Job Description:
Retaining Wall Excavation Support

Customer:
Proscape Landscape
106 Sewickley Street
New Stanton, PA 15672


Contract Amount:

Services Performed:
Excavation and backfill of a retaining wall being constructed by others. Installed storm pipe behind the retaining wall.



Wal-Mart Store # 2281-02

West Mifflin, PA


Timeframe:

Job Description:
Commercial Development

Customer:
Westra Construction, Inc.
4002 Fenton Avenue
Harrisburg, PA 17109


Contract Amount:

Services Performed:
Soil & erosion control, moved 411,000 CY dirt, 14,500 LF of pipe stone sub base, paving, and pavement markings.